Vanity!


008_0044.JPG, originally uploaded by uberlinn.

New Sink Hardware


008_0043.JPG, originally uploaded by uberlinn.

Ella hard at work


008_0042.JPG, originally uploaded by uberlinn.

This is ella looking like the wicked witch of the west

Installing the toilet


008_0038.JPG, originally uploaded by uberlinn.

It seemed to be the best way to install the toilet at the time....now the picture just looks ridiculous

Moving crew


008_0034.JPG, originally uploaded by uberlinn.

This is the crew that helped us move the vanity, all 310 pounds of it.

Andy working on the baseboard


008_0032.JPG, originally uploaded by uberlinn.

This was about hour 10 of a 12 hour day working on the bathroom

More shower hardware


008_0029.JPG, originally uploaded by uberlinn.

Shower Hardware


008_0026.JPG, originally uploaded by uberlinn.

Mary the Painter


008_0025.JPG, originally uploaded by uberlinn.

Mary came over and helped us out for the day with painting, priming, and a do-er of all things!

Painting the closet


008_0023.JPG, originally uploaded by uberlinn.

Finished installing the Shower Hardware


008_0020.JPG, originally uploaded by uberlinn.

What happens to our bedroom when we finish


008_0017.JPG, originally uploaded by uberlinn.

Installing the Baseboard


008_0014.JPG, originally uploaded by uberlinn.

Yay! New Closet


008_0013.JPG, originally uploaded by uberlinn.

Starting to Paint


008_0008.JPG, originally uploaded by uberlinn.