Tiling looking out of the bathroom


008_0214, originally uploaded by uberlinn.

Here is the floor looking the other way

Shower Pan


008_0213, originally uploaded by uberlinn.

Here is the tile on the shower floor as well as part of the vanity area

More of the floor


008_0212, originally uploaded by uberlinn.

TIles finally up on the foor!!

Full Set of Tiles


008_0210, originally uploaded by uberlinn.

This is the state of the tiles after Saturday's work

New Shelves


008_0207, originally uploaded by uberlinn.

Note the mitre cuts that the miter saw was used for...Thanks Mike!

First set of tiles set into thin-set


008_0206, originally uploaded by uberlinn.

New Mud Pan


008_0205, originally uploaded by uberlinn.

Due to the sloping of our sub-floor, the mud pan had to be removed and completely re-done....Yay!!

Beginning of the Tiling


008_0201, originally uploaded by uberlinn.

Here is the first set of tiles on the ground

Little prisoner


008_0200, originally uploaded by uberlinn.

Our little dog looks something like a prisoner!

Finally the wall is up!!!


008_0197, originally uploaded by uberlinn.

This is the first set of drywall that we have up and done!!! Tiling starts tomorrow!

Worst Job of the Bathroom


008_0193, originally uploaded by uberlinn.

So far, this is the end of the worst job we had to do for the bathroom, that was driving the screws through the cement board...ugh

Yay Overalls


008_0192, originally uploaded by uberlinn.

Here we are after a long Saturday of work!

New Light fixtures


008_0189, originally uploaded by uberlinn.

Here is the new light fixture we put up in the ceiling.

First Wall to go up in the bathroom


008_0186, originally uploaded by uberlinn.

This is the first Drywall to go up in the bathroom, you can see the insets in the background